Hi folks,
During Production order creation using CO01 as i enter though the BOM material and quantity, system opens up the configurator for the material and asks me to fill it up which i dont want to do at this level can any one suggest how to stop this configurator invoking during PO creation,
we have all products fully configurable including WIP but this is only required at SO level and not at PO level
thanks in advance